Tech has a very detailed, very professional online tour of the baseball stadium below. Lots of Tech alumni are involved in the development, 1,300+ chairback seats, fences moved back as much as possible. Have to finish construction mid-October to put in the field surface. LED lights (instant on/off). Game action is still visible while at the new concessions booth.
Last edited: